Order of operations: read your HOA documents first, submit a complete architectural request second and order the kit last. HOA approval is separate from any city permit; one does not substitute for the other. This page is general information, not legal advice.
What an HOA review usually wants
Every community sets its own form, but requests generally ask for a plot plan with distances, a description or drawing of the structure, materials and colors, and photos or examples of what it will look like. One real example, the Spring Creek Ranch HOA's architecture change request page, asks for detailed plans showing lot boundaries, house and dimensions, a plot plan showing the home relative to the proposed pergola, and any examples of what the pergola will look like when finished; it notes that city permits are required "if required," that pergolas over 200 sq ft or attached to the house also need a building permit, and that a copy goes to the HOA (Spring Creek Ranch HOA, checked November 2026). Your community's page will differ.
Submission checklist
| Item | Why the committee wants it | Tip |
|---|---|---|
| Completed ARC form | Formal record of the request | Use the current version from your manager |
| Plot plan | Shows location relative to lot lines and neighbors | Mark dimensions and the nearest fence |
| Manufacturer spec sheet or drawing | Shows size, height, materials | Attach the exact model page |
| Color and finish sample or name | Compares with guidelines | Quote the finish name |
| Photos or render of the space | Helps neighbors and reviewers picture it | A rendering on your own yard photo helps |
| Contractor details | Some HOAs require insured contractors | Ask your manager |
| City permit (if needed) | Some HOAs request a copy | See permit requirements |
Sample request letter (template)
This is a generic template. Replace the brackets and check it against your HOA's form and rules; it is not legal advice.
To: Architectural Review Committee, [Community name]
From: [Your name], [Address / lot number]
Date: [Date]I request approval to install a [freestanding / attached] pergola at the rear of my property. The structure will be approximately [width] by [depth] feet and [height] feet tall, made of [material] in [color/finish name]. It will be set back [distance] feet from the nearest property line, as shown on the attached plot plan.
Enclosed: completed ARC form, plot plan, manufacturer specification sheet for [model], photos of the proposed location, and a rendering of the proposed pergola.
I understand that I must also obtain any required city permits and will not begin work until I receive written approval. Please contact me at [phone/email] with questions.
Sincerely, [Name]
Avoid the usual delays
- Send one complete package instead of adding pieces over time.
- Match the guideline's vocabulary: if it limits "height," state the overall height.
- Do not pre-order and ask later. A non-refundable kit order before approval is the common expensive mistake.
- Keep the approval letter and its conditions with your permit file.
Show the committee what it will look like
Upload a backyard photo to the pergola visualizer for a free preview of a chosen size, material and mount. A one-time $19 Starter or $29 Pro pack unlocks HD renders and a printable HOA permit and contractor quote packet that gathers your plan details, preview and quote questions into a submission-ready layout. The packet is a preparation aid. It is not an approval from your HOA or your city, and it is not legal advice or engineering.
FAQ
Do I need HOA approval for a pergola?
Most HOAs with covenants require architectural review for exterior structures, including pergolas. Your declaration, design guidelines and application form control, so read them before you order anything.
Does a city permit replace HOA approval?
No. They are separate checks. A city permit does not establish compliance with private covenants, and HOA approval does not replace a city permit. Some HOAs ask for a copy of the building permit before construction.
How long does HOA review take?
It varies by community. Some committees meet monthly and some respond in days, and an incomplete submission usually restarts the clock. Ask your management company for the stated timeline and submission deadlines.
What if the HOA denies my pergola?
Ask for the denial in writing with the specific guideline cited, then revise materials, color, height or location and resubmit. Do not build while a decision is pending.